Sources of Noise
-Vehicles
Utility Shutdowns
-None at this time.
Deliveries
-Construction Materials
Events for the upcoming week
-Monitor River level. Reach 10.7 feet on Tuesday, July 8, 2025.
-Permit from Levee Board
-Continue sidewalk prep at Northeast of building.
-Continue curb forms.
-Continue removal of spoils.
Recap of Week ending July 6, 2025
-Continue prep curb forms.
-Remove spoils.
-Identify SWB water leak within site boundary.
-Place job trailer in Pine Street/ Prytania lot.
-Saw cut Handicap ramp at Leake Ave lot and sidewalk.
-Electrical Shop verified the light slated for removal under the pine tree was not energized. They removed the light pedestal and capped the wires.
-Letter of no objection.