Goldring Tennis and Pickleball Courts - Week of December 8, 2025

Sources of Noise

  • Construction Vehicles.
     

Utility Shutdowns

  • Domestic water shut down at 200 Broadway scheduled for 4:30pm Tuesday, December 9.

Deliveries 

  • Construction Materials.
  • Asphalt Trucks.

Events for the upcoming week

  • Continue Tennis court surfacing.
  • Pave area at new Lowerline St. hydrant.
  • Continue grandstand conduit installation.
  • Continue the drive lane surface prep.
  • Continue filling flatwork expansion joints.
  • Remove temp water feed for 200 Broadway Street.
  • Begin fencing demo at Prytania street for mock up installation.


Recap of Week ending December 7, 2025

  • Finish grading and add binder to surface of Tennis Courts.
  • Begin Tennis Court Surface paving.
  • Continue to cut expansion joints in the flatwork.
  • Run wires for Tennis court and grandstand outlets.
  • Backfill/ compact Lowerline and Perrier/ Pine St areas.
  • Adjust Eastern most Tennis court net foundation.
  • Install Dumpster area fencing.
  • Pour Lowerline St. hydrant curb.