Howard Tilton Memorial Library Basement Buildout - Week of September 18, 2020

Sources of Noise

  • Hand tools and power tools 
  • Work vehicles
  • Selective Demolition
  • Material Deliveries

Utility Shutdowns:

  • None scheduled at this time

Deliveries

  • Delivery of mechanical equipment scheduled to occur this Saturday, 9/19. 

Events for upcoming week

  • The contractor will continue MEP layout and installation. 
  • Selective demolition will occur as needed. 
  • Framing will continue.  

Recap of week performed (Sept 13 – Sept 19, 2020)

  • Layout and installation of electrical systems continues.
  • HTE is schedule to perform a multi-floor wire pull on 9/19.  
  • MCC continues duct work fabrication and installation.   
  • Donahue Favret sealed the exterior penetrations.  
  • Framing layout and selective framing installation have commenced.  
  • Selective demolition continues.