Sources of Noise

  • Excavator.
  • Skid steer.
  • Bore machine.
  • Concrete trucks.

 

Utility Shutdowns
 

  • None at this time.

 

Deliveries

  • Materials and equipment.
  • Concrete.

 

Events for upcoming week

  • Continue building structural steel.
  • Pour and finish perimeter walks.
  • Prep K Field tunnel road for two-way vehicular traffic.
  • Bore gas main in the Breeding Colony.
  • Fuse gas pipes at boring pits.


Recap of week ending September 27, 2024

  • Received building structural steel.
  • Began erecting building structure.
  • Set additional subsurface drainage pipes.
  • Prepped and formed perimeter walks.
  • Bored gas main in the Breeding Colony.
  • Continued concrete cuts for building block outs.