Sources of Noise
- None
Utility Shutdowns:
- One electrical shutdown scheduled to occur next week.
Road Closures/Blockages
- N/A
Deliveries
- Miscellaneous material deliveries
Events for upcoming week
- Execution of Punchlist throughout building continues.
- Concrete flat work is scheduled to be placed over the newly installed storm water retention system.
- Boh Bros is scheduled to install asphalt over the street cuts behind the LBC loading dock.
Recap of week ending Jan 11, 2020
- Execution of Punchlist throughout building.
- Durr Construction completed the excavation and installation of the storm water retention system.
- Boh Bros excavated and repair damaged drain line. A liner was installed in one section of the drain line.
- All Star performing exterior electrical work.
- Work performed on the sump pump located in the LBC quad.
- BNB removed and replaced the emergency exit doors on the south side of the building.