Engineering Road Stormwater Project - Week of June 10, 2025

Sources of Noise
-Heavy Equipment
-Dump trucks
-Jack hammer

Utility Shutdowns
-None at this time.

Deliveries 
-Construction equipment.
-Sand/ gravel
-General construction materials

Events for upcoming week
-Vodaland paver fill along East side of Engineering Road.
-Vodaland paver grading and laydown along West side of Engineering Road.
-Finish patch and fill of asphalt areas.
-Hydro-excavate and grade area near Paul Hall loading dock.


Recap of Week ending June 8, 2025

-Continue grading and Vodaland paver installation.
-Complete East side Vodaland paver placement.
-Begin Vodaland parking space marker installation.
-Patch asphalt areas to ensure proper surface drainage.
-Stanley Thomas Hall Delivery and setup soordination.