TNPRC Building 2 - Week of October 11, 2019

Sources of Noise

  • Hand Tools

Utility Shutdowns

  • None currently.

Deliveries 

  • Materials and equipment.

Events for upcoming week

  • Penthouse electrical rough-in ongoing.  
  • Begin taping and floating.  
  • Continue hanging drywall.  
  • Continue skimming and prepping ceiling. 
  • Crawlspace chilled water and steam lines advancing.
  • Hat channel for Architectural panels ongoing.

Recap of week ending October 10, 2019

  • Crawlspace chilled water and steam line installation ongoing.
  • Continued installing Penthouse electrical panels and conduits.
  • Weather barrier application finalized.
  • Completed hanging VAV boxes and installing fire dampers.
  • Fire system riser assembly installed.
  • Resumed skimming and prepping ceiling.