Sources of Noise
- Excavation equipment.
- Hand Tools.
Utility Shutdowns
- None at this time.
Deliveries
- Materials and equipment.
Events for upcoming week
- Begin concrete prep for field enclosure one perimeter.
- Lixit water installation at field enclosure one ongoing.
- Continue welding horizonal rails at enclosure one.
- Currently stretching enclosure one vertical fence.
- Continue pouring concrete perimeter at field enclosure two.
- Start roof framing at enclosure two.
Recap of week ending November 18, 2021
- Water storage tank finished.
- Began stretching vertical fence at field enclosure one.
- Continued concrete pour for field enclosure two perimeter.
- Hauled and spread topsoil in field enclosure two.
- Completed pulling vertical fencing at field enclosure two.
- Lixit water rough in at field enclosure one ongoing.
- Continued welding at field enclosure one.