Sources of Noise
- Excavation equipment.
- Hand Tools.
Utility Shutdowns
- None at this time.
Deliveries
- Materials and equipment.
Events for upcoming week
- Continue pouring concrete perimeter at field enclosure two.
- Haul and spread topsoil inside of field enclosure two.
- Continue to pull and tie chain fence at field enclosure two.
- Start roof framing at enclosure two.
- Weld interior rails at field enclosure two.
- Begin pulling fence at field enclosure one.
- Lixit water installation at field enclosure one.
- Tack weld horizonal rails at enclosure one.
Recap of week ending November 11, 2021
- Began pouring and finishing enclosure two concrete perimeter.
- Hauled and spread topsoil in field enclosure two.
- Continued pulling fence at field enclosure two.
- Lixit water rough in at field enclosure one.
- Continued welding at field enclosure one.