TNPRC Breeding Colony Expansion - Week of May 24, 2022

Sources of Noise

  • Excavation equipment.
  • Hand tools.

Utility Shutdowns

  • None at this time.

Deliveries 

  • None at this time.

Events for upcoming week

  • Continue seeding swales, enclosures, and disturbed areas.
  • Install wall and roof panels for corner shelters. 
  • Insulate pump assembly and pipes.  
  • Install pump pipe supports. 
  • Generator shipping date pushed back to 5.23.22

Recap of week ending May 19, 2022

  • Commissioned the tank, pumps, and water system.
  • Replaced water tank float line with copper.
  • Welded endcaps on tubing.
  • Began hydroseeding swales and disturbed areas.