Howard Tilton Memorial Library Basement Buildout - Week of October 2, 2020

Sources of Noise

  • Hand tools and power tools 
  • Work vehicles
  • Selective Demolition
  • Material Deliveries

Utility Shutdowns:

  • None at this time

Deliveries

  • Delivery of drywall will occur on 10/02

Events for upcoming week

  • The contractor will continue MEP layout and installation. 
  • Selective demolition will occur as needed. 
  • Framing will continue.  

Recap of week performed (Sept 27 – Oct 03, 2020)

  • HTE completed a new wire feed tie-in. The electrical contractor continues to rough-in electrical branch circuitry.    
  • MCC continues duct work fabrication and installation. Plumbing layout and installation continues. 
  • Donahue Favret is constructing a lift station in the empty elevator shaft. 
  • Framing layout and framing installation have commenced.  
  • Selective demolition continues.