Sources of Noise
- Power hand tools.
Utility Shutdowns
- None at this time.
Deliveries
- Materials.
Events for upcoming week
- Add glass to the operable partition rack.
- Clean and polish Terrazzo floor.
- Install bench fabric boards.
- Apply final finish to existing bricks.
- Touch-up paint walls, ceiling, and trim.
- Install glass for slider assemblies. Caulk all joints.
- Continue installing door hardware.
- F1 light fixtures ongoing.
- Install kitchenette sink.
- Acquire State Fire Marshal substantial completion.
Recap of week ending June 17, 2021
- Continued painting and touch ups.
- Benches and millwork finish has been applied.
- Applied bonding primer to existing bricks.
- Installed doors throughout the site.
- Completed glass installation with the exception of the partition track.
- Started installing F1 fixtures. F4 and F5 lights complete.