Sources of Noise

  • Truck Crane.
  • Hand Tools.
  • Small man lift.

Utility Shutdowns

  • None at this time.

Deliveries 

  • Materials.

Events for upcoming week

  • Continue roof hot work.
  • Crane lift materials.
  • Route crawlspace sewer to tie in point.
  • MEP rough in ongoing.

Recap of week ending March 2, 2024

  • Crane lifted materials, equipment, and tools.
  • Core drilled through concrete floor in Data Room.
  • Routed conduit from the new lab area to the Data Room control panel.
  • T-stat rough in for new lab.
  • Continued MEP rough in.